HOME Ice Bath ARCHIVE: Water replacement for v2.0 baths (shipped Sept '22 to Dec '23)

Recommended every 2-3 months

Important

These setup steps are for Version 2.0 baths (shipped from September 2022 to December 2023). Not sure on your version? Check here

 

Replacing the water

Power down the bath:

Turn the power to the bath off at the power socket and remove the plug.

 

Drain the bath:

Use a submersible pump to empty the water from the bath. When a little water left in the bottom, use a cloth (of wet vac) to catch any debris left in the bottom.

 

Refill the bath:

Fill the bath from a clean tap water supply to 3cm above the return flow hole (this allows for some water displacement when you get in).

Step-1

Bleed the filter:

After filling the bath to the correct level, remove any trapped air from the filter. Simply loosen the air relief key on the filter until all the air has been released. Once this is done, you can tighten the key back in place.

Do not remove the air relief key completely or the black washer that seals the key

Do not bleed the filter while the power is on as this can cause airlocks which result in an inefficient filter.

Step-2

Power on:

Plug back in and switch the power socket on. The power supply should be connected to an RCD circuit. 

Do not use an extension cable.

Step-3

Step four:

Reset your desired temperature on the control panel, or via the app. The bath will take unto 24 hours to get down to temperature.

Step-4